KTM

FLOOR 7” x 48”
FLOOR 18 x 122 cm

9645
9646
KTM 1 18x122 D1 COMP 2 200x811 - KTM

KTM001 18×122 M026

KTM 2 18x122 D1 COMP e1647953244866 200x811 - KTM

KTM002 18×122 M026

KTM 4 18x122 D1 COMP e1647957009243 200x811 - KTM

KTM004 18×122 M026

KTM 5 18x122 D1 COMP e1647957026614 200x811 - KTM

KTM005 18×122 M026

KTM 6 18x122 D1 COMP e1647957036957 200x811 - KTM

KTM006 18×122 M026

KTM 7 18x122 D1 COMP e1647957059195 200x811 - KTM

KTM007 18×122 M026

KTM 14 18x122 D1 COMP e1647957069826 200x811 - KTM

KTM014 18×122 M026

KTM 17 18x122 D1 COMP e1647957079989 200x811 - KTM

KTM 017 18×122 M026

TECHNICAL CHARACTERISTICS

FloorTape vinyl planks are designed to withstand the challenges of everyday life with contemporary design inspired by the latest trends in interior design. This new solution faithfully reproduces the appearance of wood with all the advantages that vinyl floors offer both in installation and maintenance.

Each sheet of FloorTape consists of five layers. The first and most superficial is highly resistant and protects the surface from possible aggressions that could damage its appearance.

ctecnicas comp - KTM
ctecnicas foam - KTM
ctecnicas skirting - KTM

PLACE VINYL FLOOR

Among the many advantages offered by this type of flooring is installation, which becomes a simple and quick task.

HOW TO PLACE SELF-ADHESIVE VINYL FLOOR?

1. First of all, it is important to place the FOAM, that is, the leveling foam, and carefully extend the foam roll, adhering it little by little with the adhesive tape that it has for fastening.

2. Secondly, the first piece is placed, leaving a space of approximately 0.5 cm from the wall to avoid problems in possible future dilations.

3. Next, the pieces are joined, making sure to hear the sound of the “click” so that the union is perfect and without separation.

4. After that, all the pieces are placed little by little following these steps and when we have placed about 40 meters in total, we must make an expansion joint. This is a necessary element, since it allows relative movements between two pieces.

5. And, finally, once the entire pavement has been placed, a sealing glue is applied to proceed with the placement of the skirting board.
To learn in detail how to lay vinyl flooring, see the following explanatory videos that will help you install vinyl flooring step by step.

PRICE TO PLACE VINYL FLOOR

If you have any questions, request a quote or need more information about our vinyl floors , do not hesitate to contact us . We will be delighted to be part of your next project.

Placement

How to lay vinyl flooring

Court

How to cut vinyl tile

insulating foam

How to lay insulating foam for vinyl floors

skirting board

How to install it on vinyl flooring
Prize codeP./BoxSQM/BoxSQM PaletBox/PaletKg/PieceKg/BoxKg/Palet
KTM 18x122M02681,76114,40652,1016,801.092
logo ceramic - KTM
logo panelador metros negro - KTM
anjasora ceramictouch - KTM
anjasora panelador - KTM